Never Miss a Concrete Pour Again
In construction, timing is everything. Late arrivals can mean wasted materials, delayed projects, and significant financial losses. Our AI-powered wake-up service ensures your team arrives on time, every time.
The Cost of Being Late in Construction
Construction projects operate on tight schedules where delays can cascade into major problems:
- Concrete pours that must begin at specific times
- Equipment rentals charged by the hour
- Crews waiting for key personnel to arrive
- Weather-dependent operations with narrow time windows


AI-Powered Wake-Up Calls for Construction Teams
Wakey provides a reliable system to ensure your entire team arrives on time for critical operations:
- Automated wake-up calls that confirm the recipient is actually awake
- Backup call chains to ensure critical positions are covered
- Detailed reporting on response times and attendance
- Simple scheduling interface for project managers
Key Benefits for Construction Teams
Our specialized wake-up service addresses the unique challenges of construction scheduling
AI-Powered Reliability
Our AI caller adapts to each team member, ensuring they're fully awake and ready for critical construction operations.
Attendance Tracking
Access detailed call transcripts to monitor team responsiveness and maintain accountability for important site operations.
Backup System
Never worry about missed calls with our automatic backup system, ensuring critical team members are always reached.
Since implementing Wakey for our concrete pour scheduling, we've eliminated late starts completely. The backup call system ensures we always have the right people on site, even when someone oversleeps. It's saved us thousands in potential material waste and overtime costs.
John Donovan
Project Manager, Reliable Construction Co.
Ready to optimize your construction schedule?
Join construction companies nationwide who trust Wakey for their critical timing needs.